  1. Owner: PT Saipem Indonesia , Project Name:  Karimun Yard Construction Project, GI method:  Dynamic Compaction Works, Stone Column, Supply and Installation of Vertical Drain. Volume of work:  657,700 m2 , Date: 2009
  2. Owner: PT. Angkasa Pura II (Persero), Project Name:  Pembangunan Apron Terminal III Pier I Bandara Soekarno. GI method:  Controlled Modulus Columns (CMC), Main Contractor: PT. Adhi Karya (Persero), Tbk, Volume of work:  65,174 m2 Date: 2011
  3. Owner: PT. Angkasa Pura II (Persero), Project Name:  Lanjutan pembangunan Apron Terminal III Pier I Bandara Soekarno. GI method:  Controlled Modulus Columns (CMC), Main Contractor: PT. Adhi Karya (Persero), Tbk, Volume of work:  400,000 m2 Date: 2012
  4. Owner: PT. GMF Aeroasia, Project Name:  Pendukung Atas Pekerjaan Perbaikan Tanah, Pembangunan Hanggar Narrow Body dan Fasilitas Pendukungnya di Bandara Soekarno Hatta, GI method:  Controlled Modulus Columns (CMC), Main Contractor: PT. Wijaya Karya (Persero) Tbk , Volume of work:  30,364 m2
  5. Owner: PT. Angkasa Pura II (Persero), Project Name:  Proyek Peningkatan Kapasitas Pergerakan Pesawat Bandara Soekarno Hatta,  GI method:  Controlled Modulus Columns (CMC), Main Contractor: PT. Hutama Karya (Persero), Volume of work: ±250,000 m2
  6. Owner: PT. Angkasa Pura II (Persero), Project Name:  Proyek Pembuatan Apron dan Taxi Way Kargo, CMC di Bandara Soekarno Hatta,  GI method:  Controlled Modulus Columns (CMC) dan Prefabricated Vertical Drains (PVD), Main Contractor: PT. Adhi Karya (Persero), Tbk,  Volume of work: ±100,000 m2

Past Project by PT Rekakarya Geoteknik:

  1. Project Jalan Tol Bogor-Ciawi-Sukabumi, Jambatan Cikeretek (PT. Waskita Tbk) October 2016
    o Bored Pile – 1.2m dia., 36m depth, 52 points
  2. Project Jalan Tol Medan – Kualanamu, Medan (CHEC -CSCC-HK JO) July 2016
    o Bored Pile – 0.8m dia., 39m depth, 76 points
  3. Project Wisma Atlet – Kemayoran, DKI Jakarta (PT. Waskita Tbk) May 2016
    o Bored Pile – 1.0m dia., 31m depth, 110 points
  4.  Project K2 Park, Legok, Tangerang (PT. Prioritas Land Indonesia) Jan 2016
    o Bored Pile – 0.6m & 0.8m dia., 20m – 30m depth, 500 points
  5.  Project Trans-Java Highway, Salatiga, Semarang (PT. PP Tbk) Nov 2015
    o Bored Pile – 1.2m, dia., 19m depth in rock, 68 points
  6. Project Jalan toll Pemalang to Batang, 39 KM, Main Contractor: PT Waskita. Consultant: PT Perentjana Djaja Contract type: Design and build
    1. Kolom Grout Modular (KGM) or CMC at 13 locations Bridge Approach